The Sonoma (Ca.) Water Agency sought an HVAC solution incorporating efficient and renewable energy sources as part of a renovation of it’s operations and maintenance building.

A section of the 20,578 sq. ft. building that had previously been used for warehousing was remodeled into an office space, which required extension of the HVAC system into that area. The building’s existing 51-ton HVAC system, which included 9 packaged gas-electric rooftop units of various sizes, would have required additional equipment to support these renovations.

Download Case Study